Chapter 4 Other sources of information
4.1 Reference documents
GOMOS Level 1b Detailed Processing Model, Issue 6, rev. 3, PO-RS-ACR-GS-0002
GOMOS Level 2 Detailed Processing Model, Issue 3, rev. 2, PO-RS-ACR-GS-0001
GOMOS Input/Output Data Definition, Issue 6, rev. 1, ref. PO-RS-ACR-GS-0003
GOMOS Algorithm Theoretical Basis Document, version 2.0, edited by E. Kyrölä and L. Blanot, 2007.
Formulation of disclaimer for GOMOS Level1b and Level2 products, Issue 3, rev. 2, ref. PO-TN-ACR-GS-1003
GOMOS Products Toolbox, User's manual, Issue 2, rev. 0, ACRI-ST, 2003
ENVISAT-1 products specifications, Issue 3, rev. 1, ref. PO-RS-MDA-GS-2009, 2005
GOMOS Geometry Library User Guide, Issue 3, rev. 0, ref. PO-MA-ACR-GS-0007
GOMOS Assumptions on the Ground Segment, PO-RS-DOR-SY-0029, Issue 1
GOSS - Description of sub-models (DSM), Issue 5, rev. 0, ref. PO-RS-ACR-SY-003
Envisat-1 Ground Segment Concept, Issue 5, rev.3, September 1994, ref. ESA/PB-EO(94)24
Explanatory supplement to the astronomical almanac, Edited by P.Kenneth Seidelmann, US Naval Observatory - Washington D.C., 1992
Extension of the MSIS thermosphere model into the middle and lower atmosphere, A. E. Hedin, JGR, vol.96, A2, pp. 1159-1172, 1991
ECMWF - PDS Interface, PO-RP-ESA-GS-00622, Issue 1, April 18, 1997
A fast procedure for calculating minimum cross-validation cubic smoothing splines, M.F. Hutchinson, CSIRO Division of Mathematics and Statistics
Guidelines for the specification of ground processing algorithms, Issue 1, PO-RS-ESA-GS-0252
OAD Standards: Time and Coordinate Systems for ESOC Flight Dynamics Operations, Issue 1, May 94, ESOC
|